List of Affected Building Projects
(A) Buildings with unrestricted public access that used Bolliya/Bolli-Core FR composite panels as cladding, which have either been tested and found to be non-compliant with Fire Code requirements or yet to be tested for compliance with Fire Code requirements
S/No. | Buidling Description | Address |
---|
- | - | - |
(B) Buildings that used Alubond composite panels as cladding which have been tested and found to be non-compliant with Fire Code requirements (Pending Total Removal)
S/No. | Buidling Description | Address |
---|
1. | Verdana Villas | 1 to 111 Grace Walk |
(C) Buildings that used Alcompo composite panels as cladding which have been tested and found to be non-compliant with Fire Code requirements (Pending Total Removal)
S/No. | Buidling Description | Address |
---|
- | - | - |
(D) Buildings with unrestricted public access that used composite panels as cladding without any valid CoC
S/No. | Buidling Description | Address |
---|
- | - | - |
Note: Buildings that have totally removed their non-compliant cladding will be removed from the list.
(list updated as at 6.00pm on 21/07/2021)
Contact Us
Building owners and Qualified Persons (QPs) should contact SCDF at
SCDF_Cladding_Feedback@scdf.gov.sg if they have used any non-compliant composite panels.