ANNEX 9.9A :
INSPECTION CHECKLIST FOR BUILDING UNDER CONSTRUCTION
|
---|
S/No.
| Description
| In Order
| If no, remedy
action/comments
|
---|
Yes
| No
|
---|
PART A
: PROVISION OF FIREFIGHTING SYSTEMS
|
Rising Mains
|
1
| Dry rising mains shall be installed
progressively during the course of construction as per approved plan and made
operational for all storeys except the uppermost 3 storeys, for building
exceeding 8 storeys or habitable height of 24m.
| | | |
2
| Wet rising mains shall be installed progressively during the
course of construction as per approved plan and made operational for all
storeys except the uppermost 3 storeys, for building exceeding 18 storeys or
habitable height of 60m. The following shall be provided:
(a) break tank with minimum water capacity of 11.5m3; and
(b) fire pumps which are operational and
supplied with emergency power supply. | | | |
3
| Provision of breeching inlets
(2-way/4-way)* provided as per approved plan. The following shall be complied
with:
(a) breeching
inlets made operational and housed in protective enclosure; and
(b) labelled
and numbered accordingly. | | | |
4
| Riser stacks are labelled and numbered and:
(a) earthing is provided;
and
(b) air relief valve is provided.
| | | |
5
| Landing valves provided with blank
caps and are strapped and padlocked in closed position.
| | | |
Lift
|
6
| Lift/passenger hoist ready for
firefighters’ use shall be provided for building exceeding 8 storeys or
habitable height of 24m.
| | | |
Generator
|
7
| Generator set or adequate PUB power
supply shall be
provided for emergency lighting and
firefighting purpose.
| | | |
Fire Engine Accessway
|
8
| Provision of adequate fire engine
accessway (where practicable) for firefighting purpose.
| | | |
Fire Extinguisher
|
9
| At least one fire extinguisher of
13A rating shall be provided for every 500m² or less on each floor. Where
provision of fire engine accessway is not practicable, the quantity of fire
extinguishers shall be doubled on each floor.
| | | |
PART B
: TESTING OF RISING MAINS
|
Breeching inlet
|
1
| Inlet housed in protective
enclosure.
| | | |
2
| Rigidly support
| | | |
3
| Labelled “dry/wet riser inlet” and
numbered accordingly
| | | |
4
| Clear of obstruction
| | | |
Riser
|
5
| Air relief valve provided
| | | |
6
| Labelled & numbered accordingly
| | | |
7
| Earthing provided
| | | |
Landing Valve
|
8
| Blank cap provided
| | | |
9
| Strapped and padlock in closed
position
| | | |
10
| Clear of obstruction
| | | |
Pressure/Flow
|
11
| Rising mains pipping
Hydrostatically tested at 1380 kPa
(13.8 bar) or 1.5 times the design pressure, whichever is greater, for 2
hours.
| | | |
12
| Wet rising mains
(a) Flow
rate at the topmost fully-opened landing valve (under pump/gravity feed) is
at least 27 L/s; and
(b) Running
pressure is between 2 bars and 5.5 bars at the landing valve
| | | |
* Delete as appropriate
Date inspected:_________________ by__________________________ Signature______________________