W.e.f. 1 Apr 2024 onwards, refresher training for Fire Station Emergency Medical Technicians will be enhanced and the In Camp Training period will be extended from 19 to 23 days. Please check with your Deputy Commander Fire Station or unit for more info.

W.e.f. 1 Jul 2024, SCDF will change its sender ID for NS Mobilisation matters from “91449746” to “80709995”. This follows the gov.sg SMS Sender ID announcement on 13 Jun 2024 and aims to help recipients recognise and authenticate SMSes from SCDF.

Please be informed that Bukit Batok Fire Station will not be hosting the weekly Saturday Fire Station Open House from 30 Sep 2023 to Feb 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

3

Search CPFPRTS
Include in Search
Clear All

Please enter a keyword to search

9.7.1 Facility buildings

a. Requirements for facility buildings

Requirements stipulated in the previous sections of this Code for transit stations and trainways are not applicable to the RTS facility buildings. RTS facility buildings e.g. on-line electric sub-station, OCC, relay building, and other electrical and mechanical installations shall comply fully with the Code of Practice for Fire Precautions in Buildings, except as herein modified.

b. Facility buildings under the aboveground trainways

For RTS facility buildings under the aboveground trainways, the following requirements shall also be complied with:

(1) Building within 6m of the outer edges of the aboveground trainway shall be at least 2-hrs compartmented; and

(2) Automatic fire alarm system shall be provided in accordance with SS 645. The fire alarm system shall be connected to the OCC.