To help businesses reduce regulatory compliance costs, SCDF will implement three-year Fire Certificate (FC) validity periods for renewal applications from 1 Apr 2026 onwards. Please refer to the SCDF Fire Certificate webpage for more information.
The Civil Defence Heritage Gallery and Emergency Preparedness Centre will reopen to the public from 21 Apr 2026. The weekly Saturday morning Fire Station Open House will also be resumed with effect from 25 Apr 2026.
Please be informed that Central Fire Station will not be hosting the weekly Saturday Fire Station Open House on 30 May 2026. Please refer to the list of other Fire Stations that are available for visits.

1

/

3

Search CPFPRTS
Include in Search
Clear All

Please enter a keyword to search

9.6.1 Operation control centre (OCC)

a. Fire separation

The OCC shall have a fire separation of at least 2 hrs from other areas. It shall be provided with dedicated access/ exit from/ to the external via enclosures having a fire resistance of at least 2 hrs.

Note: The protected enclosure is not necessary if the access/ exit is direct from/ to the external.

b. Power supply

Equipment of OCC essential for the operation of trains and the tunnel ventilation system shall be provided with secondary power supply.

c. Ventilation

The OCC shall have the same ventilation requirements as the FCC.

d. Hotline

A hotline shall be provided between the OCC and SCDF Operations Centre.

e. Standby OCC

The above requirements of OCC shall apply to the standby OCC, where provided.