Government officials will NEVER ask you to transfer money or disclose bank log-in details over a phone call. Call the 24/7 ScamShield Helpline at 1799 if you are unsure if something is a scam. For details, visit the ScamShield website.
The application for Registered Inspector (RI) is opened from 1 to 30 Nov 2025. Please visit https://www.scdf.gov.sg/fire-safety-services-listing/downloads/forms
Please be informed that Alexandra Fire Station and Jurong Fire Station will not be hosting the weekly Saturday Fire Station Open House on 15 November 2025. Please refer to the list of other Fire Stations that are available for visits.
Please be informed that Punggol Fire Station will not be hosting the weekly Saturday Fire Station Open House on 22 November 2025. Please refer to the list of other Fire Stations that are available for visits.

1

/

4

Search TRHS
Include in Search
Clear All

Please enter a keyword to search

The following shall be observed:

a. Allowing an opening in the HS wall and later erecting the HS door frame and door leaf in this opening, followed by casting concrete around it is not permitted.

b. When casting the HS wall with HS door frame, a dummy door leaf of adequate design shall be placed to ensure the stability and prevent the bending, warping or displacement of the HS door frame during concreting.

c. The FFL of the floor slab outside the HS shall be done such that the HS door can be opened adequately for the peacetime use of the HS.

d. Modification of door frame, cutting of door frame stiffener for ease of installing is not permitted.