Government officials will NEVER ask you to transfer money or disclose bank log-in details over a phone call. Call the 24/7 ScamShield Helpline at 1799 if you are unsure if something is a scam. For details, visit the ScamShield website.
SCDF does not endorse or certify products. Legitimate fire safety products are certified by independent accredited Certification Bodies. Claims of 'SCDF-approved' or similar are false. Report them at https://www.scdf.gov.sg/home/feedback.
With effect from 21 Dec 2026, the SCDF Hotline (1800 280 0000) will cease operations. For emergencies, please call 995 or SMS to 70995. For non-emergencies, please contact us via the SCDF Feedback Form.
The application for Registered Inspector (RI) is open from 1 Nov to 30 Nov 2026. Please download the application form at https://www.scdf.gov.sg/fire-safety-services-listing/downloads/forms-and-guides.

1

/

4

Search TRHS
Include in Search
Clear All

4.3.1 Clearance in front of and around Fragmentation Plate

The minimum clearance from the fragmentation plate to RC beam or structure or service shall be 50mm. Where the RC beam or structure or service is fronting the fragmentation plate of ventilation sleeve, the clear distance between them shall be at least 500mm. See FIGURE 4.3.1.

4.3.2 False Ceiling below Ventilation Sleeves

Where false ceilings are provided outside the HS and below the ventilation sleeves, there shall be perforated access panels of minimum size of 600mm x 600mm positioned directly below each ventilation sleeve. See FIGURE 4.3.2.