Government officials will NEVER ask you to transfer money or disclose bank log-in details over a phone call. Call the 24/7 ScamShield Helpline at 1799 if you are unsure if something is a scam. For details, visit the ScamShield website.
SCDF does not endorse or certify products. Legitimate fire safety products are certified by independent accredited Certification Bodies. Claims of 'SCDF-approved' or similar are false. Report them at https://www.scdf.gov.sg/home/feedback.
With effect from 21 Dec 2026, the SCDF Hotline (1800 280 0000) will cease operations. For emergencies, please call 995 or SMS to 70995. For non-emergencies, please contact us via the SCDF Feedback Form.
The application for Registered Inspector (RI) is open from 1 Nov to 30 Nov 2026. Please download the application form at https://www.scdf.gov.sg/fire-safety-services-listing/downloads/forms-and-guides.

1

/

4

Safety Considerations for Workers’ Dormitories

For companies planning to handle/store hazardous substances and flammable materials, agencies (SCDF, NEA) may require a Quantitative Risk Assessment (QRA) study to be carried out. Based on the QRA study, Health & Safety (H&S) buffer may be generated based on the projected consequence of potential fire, explosion and/or release of toxic gases from the said company.

Due to safety reasons, agencies (SCDF, NEA, MOM, JTC, URA) do not allow workers’ dormitories to be sited within existing H&S buffer because workers may not be in a state of alertness at night (e.g. sleeping) to carry out the necessary protective actions such as evacuation or In-Place-Protection (IPP), when a major incident occurs.

For applications that are not supported due to H&S buffer, applicant is advised to look for alternative accommodation for your workers at other locations. You may refer to MOM’s website on Housing for Foreign Workers for more information on the various types of housing available such as secondary Factory Converted Dormitories (FCDs) and Purpose Built Dormitories (PBDs).

SCDF’s Application Flow Chart for Workers’ Dormitory

SCDF's Workflow for Workers' Dormitory Application

 

  1. To seek SCDF’s approval on non-FCD applications from 1 Oct 2026 and clearance for H&S buffer, please email [email protected].
  2. For FCD applications after 1 Oct 2026, please refer to MOM's website on new IPNO portal.
  3. For more information on Plan Approval and Fire Safety Certificate (FSC) / Temporary Fire Permit (TFP), refer to SCDF’s Plan Approval and Fire Safety Certificate / Temporary Fire Permit.
  4. Alternative workers’ accommodation may be found at: MOM's website.
  5. For an increase in occupancy load (OL) of a dormitory, a Qualified Person (QP) is required to be engaged to review the fire safety provisions (such as the means of escape, etc.) to ensure the design can meet prevailing Fire Code requirements. The QP is also required to submit plans to SCDF for the increase in OL as well as any fire safety works (i.e. partition works, etc.) and apply for a TFP / FSC accordingly.