Government officials will NEVER ask you to transfer money or disclose bank log-in details over a phone call. Call the 24/7 ScamShield Helpline at 1799 if you are unsure if something is a scam. For details, visit the ScamShield website.
SCDF does not endorse or certify products. Legitimate fire safety products are certified by independent accredited Certification Bodies. Claims of 'SCDF-approved' or similar are false. Report them at https://www.scdf.gov.sg/home/feedback.
With effect from 21 Dec 2026, the SCDF Hotline (1800 280 0000) will cease operations. For emergencies, please call 995 or SMS to 70995. For non-emergencies, please contact us via the SCDF Feedback Form.
The application for Registered Inspector (RI) is open from 1 Nov to 30 Nov 2026. Please download the application form at https://www.scdf.gov.sg/fire-safety-services-listing/downloads/forms-and-guides.

1

/

4

Search TRSS
Include in Search
Clear All

2.7.1 Aggregate Wall Height of NS

a. Several NS can be stacked one on top of the other within an SS tower, without the need for NS floor slab to be connected to external floor slab, provided that the aggregate wall height of the NS does not exceed 12m. Refer to FIGURE 2.7.1.

b. Aggregate wall height of NS refers to the sum of the height(s) of NS between two levels of the SS tower where the full external perimeter of the SS tower at those levels are structurally connected by floor slabs or tie beams to the structural frame of the building. Where tie beams are used, they shall be designed with at least equivalent stiffness to the floor slabs.

2.7.2 Shielded and Unshielded NS Walls

The relevant architectural technical requirements of the shielded or unshielded NS Walls as stipulated in Clause 3.3.3 & 3.3.4 shall be complied with.