To help businesses reduce regulatory compliance costs, SCDF will implement three-year Fire Certificate (FC) validity periods for renewal applications from 1 Apr 2026 onwards. Please refer to the SCDF Fire Certificate webpage for more information.
The Civil Defence Heritage Gallery and Emergency Preparedness Centre will reopen to the public from 21 Apr 2026. The weekly Saturday morning Fire Station Open House will also be resumed with effect from 25 Apr 2026.
Please be informed that Central Fire Station will not be hosting the weekly Saturday Fire Station Open House on 30 May 2026. Please refer to the list of other Fire Stations that are available for visits.

1

/

3

Search Fire Code
Include in Search
Clear All

Please enter a keyword to search

3.10.1 Non-combustibility of structure

Every exit staircase, including the treads/ risers and landing, shall be constructed of non-combustible materials. The exception is for buildings under PG I, where only the stringer or structures supporting the treads/ risers and landing shall be constructed of non-combustible materials.

3.10.2 Compartmentation

The exit staircase shall be separated from other parts of the building by a masonry structure or drywall complying with Cl.3.8.7b. which shall have fire resistance for not less than the period required by Cl.3.3 for elements of structure. The flight, landing and supporting structures of the exit staircase shall comply with Cl.3.10.1 and fire resistance rating is not required.

3.10.3 Exit doors

Doors opening into the exit staircase shall have at least ½-hr fire resistance rating and fitted with an automatic self-closing device.

3.10.4 Finishes

Finishes to the ceilings/ walls and floors of exit staircase shall be of non-combustible materials.


Updated 3 Sep 2025