Fire Safety of Buildings (with Cladding)

 

 


 

List of Affected Building Projects

(A) Buildings with unrestricted public access that used Bolliya/Bolli-Core FR composite panels as cladding which have been tested and found to be non-compliant with Fire Code requirements (Pending Total Removal)

S/No Building Description Address
1. JTC Launchpad @ One-North (Industrial) 73, 73B, 75, 77, 81 Ayer Rajah Crescent

 

(B) Buildings with unrestricted public access that used Bolliya/Bolli-Core FR composite panels as cladding which have yet to be tested for compliance with Fire Code requirements

S/No Building Description Address
1. Cathedral of the Good Shepherd A Queen Street

 

(C) Buildings that used Alubond composite panels as cladding which have been tested and found to be non-compliant with Fire Code requirements (Pending Total Removal)

S/No Building Description Address
1. 36 Jalan Tukang 36 Jalan Tukang
2. 51 Seletar Aerospace View 51 Seletar Aerospace View, Seletar Aerospace Park
3. 61 Seletar Aerospace View 61 Seletar Aerospace View, Seletar Aerospace Park
4. CT Hub 2 Kallang Avenue
5. JTC CleanTech Two @ CleanTech Park 3 Cleantech Loop
6. Pasir Panjang Terminal Building 3 3 Harbour Drive
7. Performance Building 158 Kallang Way
8. Singapore Polytechnic
(Teaching Blocks, T1 to T10)
500 Dover Road
9. Singapore Pools Building 210 Middle Road
10. The Peak @ Cairnhill I 51 Cairnhill Circle
11. The Peak @ Cairnhill II 61 Cairnhill Circle
12. Verdana Villas 1 to 111 Grace Walk
13. Ventilation Building at Marina Coastal Expressway 201 Marina East Drive
14. Temasek Polytechnic
(Blocks 25A and 28A)
21 Tampines Avenue 1

Note: Buildings that have totally removed their non-compliant cladding will be removed from the list.

 

(lists updated as at 6pm on 24/01/2018)

 


 