At 1806hrs, SCDF received a call alerting us to the activation of the
fire alarm at 151 Gul Circle. Upon receiving the notification, 10 Fire
Engines, 1 Red Rhino, 8 Supporting Vehicles, I ambulance, with approximately
60 personnel were immediately dispatched to the 151 Gul Circle.
SCDF arrived at location within 4 minutes. The fire was seen burning intensely
towards the rear portion of the factory. The factory measured about 200m
by 100m.
SCDF fire-fighters immediately set up offensive fire fighting water jets
to prevent the fire from spreading to the front of the factory. The factory
deals with spare parts for textile machines. Fire was extinguished by
9 water jets and 1 foam jet. Fire was confined to the rear 1/3 portion
of the factory. Fire was brought under control within 45 minutes. The
cause of the fire is being investigated.
|